50th Anniversary

The main milestones and awards achieved for more than half a century.

1963: At the beginning of our establishment, MONTREL was awarded the first project related to electrical installation for Butane plant in Dos Hemanas (Seville), being the biggest project which was carried out heretofore, according to our industrial activity.

1972: Implementation of all electrical infrastructures for ‘Seville Feria de Abril’ in order to relocate it to Los Remedios (Seville).

1974: Works on the plant of CAMPSA, in Monzalbarba (Zaragoza). Trabajos en la planta de Campsa en Monzalbarba (Zaragoza). These Works served as an example for the rest of their factories.

1977: Design, Project and Implementation of particular and challenging Overhead line (OHL) located on the summit in Tetica de Bacares (Almería) for TELEFONICA. This one was such a groundbreaking work at that time due to its great complexity involved.

1980: General Automation and Control of the main oil pipeline between Rota-Zaragoza, whch it was one of the largest pipelines automated in Europe at that time.

1981: Electrical installation and lighting for Betis and Sevilla stadiums on the occasion of 1982 World Cup in Spain.

1985: Integrated automation for truck loading facilities in refinery located to Sines (Portugal).

1988: It was key year because we performed several works on Expo 92, like outdoors climate-control of Exhibition Area in Isla de La Cartuja.

1990: Electrical equipment and standard cabinets to be implemented in electrical substations for Red Eléctrica de España (REE).

1992: Design, software and own manufacturing certified of control apparatus for several plants of Compañía Logística de Hidrocarburos (CLH).

1994: Various Engineering projects for CEPSA and REPSOL.

1996: Works on La Pampilla refinery, which is located to Lima (Perú), being one of the most important in Latin America.

1999: Automation and Control implemented in LNG Truck Loading Facilities, including cryogenic services, for ENAGAS located to several plants in Cartagena, Huelva and Barcelona. These three ones were the first kind of mentioned installations which were performed in Spain.

2002: Computer engineering and software development to be implemented the new corporative communication system (FACS) for BP.

2008: Manufacturing of protection, control and metering cabinets for SIEMENS to be implemented in a new thermal power plant in Qatar.

2009: A great number of projects performed for CEPSA, ENAGAS, BP, REPSOL and CLH.

2010: Engineering and automation of the first truck loading facility performed in Chile for Liquefied Natural Gas. GNL Quintero was our client in mentioned project.

2012: Works for Korean industrial SKSOL Lube Base Oils.

2013: Contractual agreement with ENAGAS and contract award for Chile, which amounts to 3M€.